Energy & Environment
Hydropower, Banja
Isobar Construction, as the main subcontractor for civil worked on the Banja Hydropower project, completed key tasks for LIMAK AGE Turkey, including earthworks, structural works, and building site infrastructure like the camp, offices, and power facilities.
The Banja hydropower plant, part of the Devoll Hydropower Project, features a dam with a capacity of 72 MW and an annual output of 255 GWh, contributing to the project's total installed capacity of 269 MW and 700 GWh annual production.
Hydropower, Moglica
Isobar Construction, as the main subcontractor for the Moglicë Hydropower project for LIMAK AGE Turkey, successfully completed earthworks, structural works, and specific civil tasks.
The Moglicë hydropower plant features a 167-meter high asphalt-core rock-fill dam, one of the tallest of its kind, with a storage capacity of 380 million cubic meters. The plant has an installed capacity of 197 MW and an annual production of 450 GWh, utilizing a 10.7 km tunnel to harness water from the Moglicë reservoir.
Hydropower, Kukes
Isobar Construction served as the main contractor for three hydropower stations in the Kukes area, successfully completing all civil works, access roads, and infrastructure development.
Electrical Cabin, Tirane
Isobar Construction, as a contractor for OSHE Tirana, completed the reconstruction of electrical cabins and the regional substation in Tirana East.
20KV Power Line, Llogara
Isobar Construction, as a contractor for SHNASI Invest, completed the construction of the 20KV medium voltage cable line in Llogara, Vlora, including all civil works such as channelling, cable laying, backfilling, asphalt work, and installation of road signs